<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Kansas City - Meeting of Transportation, Infrastructure and Operations Committee on 4/26/2023 at 9:00 AM</title><link>https://kansascity.legistar.com/Gateway.aspx?M=CalendarDetail&amp;From=RSS&amp;ID=1099867&amp;GUID=56627EC1-8DC1-40FD-B771-E1302F8B758B</link><description /><generator>Legistar</generator><ttl>15</ttl><atom:link href="https://kansascity.legistar.com/Feed.ashx?GUID=56627EC1-8DC1-40FD-B771-E1302F8B758B&amp;ID=1099867&amp;M=CalendarDetail&amp;Title=Kansas+City+-+Meeting+of+Transportation%2C+Infrastructure+and+Operations+Committee+on+4%2F26%2F2023+at+9%3A00+AM" rel="self" type="application/atom+xml" /><item><title>230320</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123681&amp;GUID=69BFCFC9-5EDB-4CF1-BF03-8D043A9C5436</link><guid isPermaLink="false">69BFCFC9-5EDB-4CF1-BF03-8D043A9C5436-2023-05-18-16-28-06</guid><description>File #: 230320&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Councilmember Heather Hall

Amending Committee Substitute for Ordinance No. 200182, passed on March 5, 2020, by repealing Conditions  3, 4, 6 and 33 contained in Section B of the Ordinance, which required the developer to install a traffic signal at the intersection of N.E. Barry Road and N. Indiana Avenue, make other related intersection improvements, and install a southbound right turn lane to westbound Highway 152 on ramp prior to the issuance of a certificate of occupancy for Phase 1 of Staley Corners East; and amending Committee Substitute for Ordinance No. 200183, passed on March 26, 2020,  by repealing Condition  4 contained in Section B of the Ordinance  to remove the requirement for the construction of a second northbound left turn lane on N. Indiana Avenue at its intersection with N.E. Barry Road.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Thu, 18 May 2023 16:28:06 GMT</pubDate></item><item><title>230322</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169364&amp;GUID=DB18679A-FE79-465A-A0CC-7832318FC68E</link><guid isPermaLink="false">DB18679A-FE79-465A-A0CC-7832318FC68E-2024-01-10-21-28-28</guid><description>File #: 230322&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of Public Works Department

Estimating and appropriating the amount of $665,526.58 from the Capital Improvements Fund; authorizing execution of a contract with Transystems Corporation, in the amount of $665,526.58 for construction inspection services for the N.W. Waukomis Drive Complete Streets Project from N.W. Englewood Road to NW 68th Street and establishing an effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Wed, 10 Jan 2024 21:28:28 GMT</pubDate></item><item><title>230339</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169379&amp;GUID=F440C962-9539-41AD-8D42-29592AB0FB4F</link><guid isPermaLink="false">F440C962-9539-41AD-8D42-29592AB0FB4F-2023-05-09-15-47-59</guid><description>File #: 230339&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department

Appropriating $5,888,303.25 from the Unappropriated Fund Balance of the Public Mass Transportation Fund; authorizing the Director of Public Works to execute $10,371,636.25 construction contract with J.M. Fahey Construction for Street Resurfacing North of the Missouri River with a thirty percent (30%) contingency; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 15:47:59 GMT</pubDate></item><item><title>230340</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169380&amp;GUID=40D4863B-4682-46BC-AB97-BCDC5D6792DA</link><guid isPermaLink="false">40D4863B-4682-46BC-AB97-BCDC5D6792DA-2023-05-09-15-57-54</guid><description>File #: 230340&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department 

Appropriating $305,134.14 from the Unappropriated Fund Balance of the Public Mass Transportation Fund; authorizing the Director of Public Works to execute $9,541,516.25 construction contract with J.M. Fahey Construction for Street Resurfacing from the Missouri River to 63rd Street with a thirty percent (30%) contingency; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 15:57:54 GMT</pubDate></item><item><title>230341</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169381&amp;GUID=D99ECB85-6589-45BA-8D6F-38A59F230C0E</link><guid isPermaLink="false">D99ECB85-6589-45BA-8D6F-38A59F230C0E-2023-05-09-15-57-54</guid><description>File #: 230341&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department 

Authorizing the Director of Public Works to execute $9,857,382.50 construction contract with J.M. Fahey Construction for Street Resurfacing 63rd Street to South City limits with a thirty percent (30%) contingency; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 15:57:54 GMT</pubDate></item><item><title>230342</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169382&amp;GUID=B1D9C5F7-9708-4186-9145-20F82A3AEDF6</link><guid isPermaLink="false">B1D9C5F7-9708-4186-9145-20F82A3AEDF6-2023-05-09-16-07-51</guid><description>File #: 230342&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department 

Authorizing the Director of Public Works to execute $1,343,200.00 construction contract with Vance Brothers, Inc. for Citywide Street Crack Sealing; authorizing the Director of Public Works to increase this contract by up to thirty percent (30%) without further Council approval; and recognizing this ordinance for having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 16:07:51 GMT</pubDate></item><item><title>230343</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169383&amp;GUID=C5D034A9-E6D5-45C2-931F-E514D1D94E4E</link><guid isPermaLink="false">C5D034A9-E6D5-45C2-931F-E514D1D94E4E-2023-05-09-16-17-58</guid><description>File #: 230343&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department

Authorizing the Director of Public Works to execute $6,329,701.39 construction contract with Vance Brothers, Inc. for Citywide Street Microsurfacing; authorizing the Director of Public Works to increase this contract by up to thirty percent (30%) without further Council approval; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 16:17:58 GMT</pubDate></item><item><title>230336</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6169377&amp;GUID=7B3AAEC9-0DCF-41F7-93AF-8C5BD1C413B5</link><guid isPermaLink="false">7B3AAEC9-0DCF-41F7-93AF-8C5BD1C413B5-2023-05-09-16-27-56</guid><description>File #: 230336&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of Parks and Recreation Department 
Estimating revenue in the amount of $125,000.00 in the Capital Improvements Grant Fund; appropriating that amount for the North Terrace Lake Improvements project to the same fund; and establishing an effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 09 May 2023 16:27:56 GMT</pubDate></item><item><title>230350</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6176814&amp;GUID=30077C65-8B9D-44DF-A8F6-5F790965D84A</link><guid isPermaLink="false">30077C65-8B9D-44DF-A8F6-5F790965D84A-2023-08-08-21-08-10</guid><description>File #: 230350&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Water Services Department

Authorizing a $6,234,332.30 construction contract with The Havens Construction Company, Inc., for the Sewer Separation: Outfall 054 project; authorizing a maximum expenditure of 6,860,000.00; authorizing a $900,000.00 design professional services Amendment No. 2 to Contract 1573 with CDM Smith, Inc. for Sewer Separation: Outfall 054 project for a total contract amount of $1,696,756.00; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 08 Aug 2023 21:08:10 GMT</pubDate></item><item><title>230351</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6176819&amp;GUID=73C0BE70-AA57-44D0-B531-8CCEEA361B5D</link><guid isPermaLink="false">73C0BE70-AA57-44D0-B531-8CCEEA361B5D-2023-05-05-16-59-56</guid><description>File #: 230351&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Water Services Department

Authorizing a $10,447,000.00 construction contract with Landmark Structures I, LP, for the Prospect Elevated Water Storage Tank project; authorizing a maximum expenditure of $11,500,000.00; and authorizing a $825,000.00 design professional services Amendment No. 1 to Contract No. 9231 for the Elevated Water Storage Tank project with Burns &amp; McDonnell Engineering Company, Inc., for a total contract amount of $2,825,000.00.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Fri, 05 May 2023 16:59:56 GMT</pubDate></item><item><title>230278</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6104171&amp;GUID=75D0C8CF-B1B3-4359-8097-0D564CC36EF4</link><guid isPermaLink="false">75D0C8CF-B1B3-4359-8097-0D564CC36EF4-2025-12-30-14-39-40</guid><description>File #: 230278&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Aviation Department

Appropriating $1,971,481.00 from the Unappropriated Fund Balance of the Aviation Fund; and authorizing a $12,421,575.00 contract with Siemens Industry, Inc., for operations and maintenance service of low voltage systems in the single terminal facility at Kansas City International Airport.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 30 Dec 2025 14:39:40 GMT</pubDate></item><item><title>230251</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6068437&amp;GUID=BEE5066D-5792-49EB-95F9-3F82CE161E19</link><guid isPermaLink="false">BEE5066D-5792-49EB-95F9-3F82CE161E19-2023-08-14-22-07-45</guid><description>File #: 230251&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department

Authorizing an agreement not to exceed $66,728,590.00 with the Kansas City Area Transportation Authority to provide fixed route, paratransit and on-demand transit services and certain specialized services for the City of Kansas City, Missouri between May 1, 2023 and April 30, 2024.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Mon, 14 Aug 2023 22:07:45 GMT</pubDate></item><item><title>230304</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123663&amp;GUID=18F49A8A-B359-40FB-B41C-14AA2003F0EA</link><guid isPermaLink="false">18F49A8A-B359-40FB-B41C-14AA2003F0EA-2023-05-05-16-59-56</guid><description>File #: 230304&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department

Authorizing a contract with H.W. Lochner, Inc. in the amount of $474,995.00 for construction inspection services for the North Green Hills Road project between N.W. 78th Street and N.W. Barry Road; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Fri, 05 May 2023 16:59:56 GMT</pubDate></item><item><title>230313</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123662&amp;GUID=1212D19A-2B3F-4774-B4C7-25013A22B719</link><guid isPermaLink="false">1212D19A-2B3F-4774-B4C7-25013A22B719-2023-05-05-16-59-56</guid><description>File #: 230313&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of the Public Works Department

Authorizing Amendment No. 3 with Walter P Moore, Inc., in the amount of $256,278.00 for additional construction phase services for the North Green Hills Road project between N.W. 78th Street and N.W. Barry Road for a total contract amount of $1,040,224.00; and recognizing this ordinance as having an accelerated effective date&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Fri, 05 May 2023 16:59:56 GMT</pubDate></item><item><title>230315</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123652&amp;GUID=2718C967-CA0C-459F-8246-A674AC528DA5</link><guid isPermaLink="false">2718C967-CA0C-459F-8246-A674AC528DA5-2024-06-25-17-48-34</guid><description>File #: 230315&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of Public Works Department

Reducing an appropriation in the amount of $2,842,818.83 in the General Obligation Series 2018 and 2021 Q1 Bond Funds and appropriating $2,842,818.83 from the Unappropriated Fund Balance in the General Obligation Series 2018 and 2021 Q1 Bond Funds to the North Green Hills Road Reconstruction Project account; authorizing execution of a $16,072,885.85 contract with Pyramid Contractors, Inc. for the project; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Tue, 25 Jun 2024 17:48:34 GMT</pubDate></item><item><title>230317</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123653&amp;GUID=6BACD357-D98D-4AF7-BF56-DCD6C7B5214E</link><guid isPermaLink="false">6BACD357-D98D-4AF7-BF56-DCD6C7B5214E-2023-06-26-16-18-05</guid><description>File #: 230317&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of Public Works Department 

Reducing an appropriation in the amount of $8,000,000.00 in the Go Bond 2023 Q2 Fund; appropriating the amount from the Unappropriated Fund Balance in the Go Bond 2023 Q2 Fund to the Swope Park Industrial Flyover Bridge Project; authorizing a construction contract with Radmacher Brothers Excavating, Inc. in the amount of $7,946,504.44 for the Swope Park Industrial Flyover Bridge - Phase 2 Project; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Mon, 26 Jun 2023 16:18:05 GMT</pubDate></item><item><title>230318</title><link>https://kansascity.legistar.com/Gateway.aspx?M=LD&amp;From=RSS&amp;ID=6123654&amp;GUID=5D779DAA-F9CC-48C8-9691-DEAEB7AB94FA</link><guid isPermaLink="false">5D779DAA-F9CC-48C8-9691-DEAEB7AB94FA-2023-05-05-16-59-56</guid><description>File #: 230318&lt;br /&gt;Ver.: 1&lt;br /&gt;Agenda #: &lt;br /&gt;Type: Ordinance&lt;br /&gt;Title: Sponsor:  Director of Public Works Department 
Authorizing Amendment No. 2 in the amount of $340,610.00 for inspection services with Olsson Associates for the Swope Park Industrial Flyover Bridge project for a total contract amount of $766,515.40; and recognizing this ordinance as having an accelerated effective date.&lt;br /&gt;Action: &lt;br /&gt;Result: </description><category>Ordinance</category><pubDate>Fri, 05 May 2023 16:59:56 GMT</pubDate></item></channel></rss>