ORDINANCE NO. 250430
title
Sponsor: Director of Water Services Department
Authorizing a $20,670,469.00 progressive design-build Amendment No. 2 to Contract No. 470 with Burns & McDonnell Engineering Company, Inc., for the Dr. Jeremiah Cameron Park and Westport Stormwater Improvements project for a total contract amount of $30,316,573.00; and recognizing this ordinance as having an accelerated effective date.
body
WHEREAS, City Council passed Ordinance No. 240349 on April 11, 2024, authorizing a $2,741,000.00 progressive design-build contract with Burns & McDonnell Engineering Company, Inc., for Phase 1 pre-final design of the proposed stormwater improvements defining project scope, requirements, plans, and specifications to a level of detail adequate for establishment of a Contract Price for Phase 2 services for the Dr. Jeremiah Cameron Park and Westport Stormwater Improvements project; and
WHEREAS, City Council passed Ordinance No. 241079 on January 9, 2025, authorizing a $6,905,104.00 Amendment No.1 to the progressive design-build contract with Burns & McDonnell Engineering Company, Inc., for Phase 1 pre-final design of the proposed stormwater improvements defining project scope, requirements, plans, and specifications to a level of detail adequate for establishment of a Contract Price for Phase 2 services for the Dr. Jeremiah Cameron Park and Westport Stormwater Improvements project; and
WHEREAS, this proposed ordinance is for a $20,670,469.00 Amendment No. 2 for Phase 2, which is the final phase of construction to alleviate frequent flooding in Westport, including storm sewer replacement, sewer separation, green infrastructure, underground storage, streetscape improvements water main replacement, and utilization of opti real-time controls being implemented at two large underground storage locations to optimize the storage capacity and maximize the benefit to the combined sewer system; NOW, THEREFORE,
BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
Section 1. That the Director of Water Services Department is authorized to execute Amendment No. 2 to Contract No. 470 in the amount of $20,670,469.00, for a total contract amount of $30,316,573.00, with Burns & McDonnell Engineering Company, Inc., for the Dr. Jeremiah Cameron Park and Westport Stormwater Improvements project, Project No. 82000379. A copy of this amendment is on file in the office of Water Services.
Section 2. That the Director of Water Services is authorized to expend up to the sum of $20,670,469.00 from the following accounts:
AL-8082-807705-B-80002611 Water Main Replacement Program $ 2,764,560.00
26-8110-807769-B-81000955 Overflow Control Program 564,800.00
AL-3625-808054-B-82000379 Jeremiah Park/Westport 4,802,503.00
AL-3626-808054-B-82000379 Jeremiah Park/Westport 8,000,000.00
AL-3624-808054-B-82000332 Jeremiah Park/Westport 4,538,606.00
TOTAL $20,670,469.00
Section 3. That this ordinance, relating to the design, repair, maintenance or construction of a public improvement, is recognized as an ordinance with an accelerated effective date as provided by Section 503(a)(3)(D) of the City Charter and shall take effect in accordance with Section 503, City Charter.
end
______________________________________________________
I hereby certify that there is a balance, otherwise unencumbered, to the credit of the appropriation to which the foregoing expenditure is to be charged, and a cash balance, otherwise unencumbered, in the treasury, to the credit of the fund from which payment is to be made, each sufficient to meet the obligation hereby incurred.
______________________________
Tammy L. Queen
Director of Finance
Approved as to form:
______________________________
Mark P. Jones
Senior Associate City Attorney