File #: 210346    Version: 1 Name:
Type: Ordinance Status: Agenda Ready
File created: 4/23/2021 In control: Council
On agenda: 4/29/2021 Final action:
Title: Rezoning about 2.5 acres generally located on the south side of E. 38th Street, on the west side of Montgall Avenue and the east side of Prospect Avenue, from Districts B3-2 and R-2.5 to District UR and approving a development plan to allow for a 35 unit multi- family residential development within four buildings. (CD-CPC-2020-00091)
Attachments: 1. FACTSHEET, 2. Staff Report, 3. Exhibit A_ Section Map

ORDINANCE NO. 210346

 

 

title

Rezoning about 2.5 acres generally located on the south side of E. 38th Street, on the

west side of Montgall Avenue and the east side of Prospect Avenue, from Districts B3-2 and R-2.5 to District UR and approving a development plan to allow for a 35 unit multi-

family residential development within four buildings. (CD-CPC-2020-00091)

 

body

                    BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

Section A. That Chapter 88, Code of Ordinances of the City of Kansas City, Missouri, commonly known as the Zoning and Development Code, is hereby amended by enacting a new section to be known as Section 88-20A-1271, rezoning an area of

approximately 2.5 acres generally located on the south side of E. 38th Street, on the west side of Montgall Avenue and the east side of Prospect Avenue, from Districts B3-2 (Community Business) and R-2.5 (Residential 2.5) to District UR (Urban Redevelopment), said section to read as follows:

 

Section 88-20A-1271. That an area legally described as:

 

All of Lots 157 thru 164 and a part of Lot 165 also, all of Lots 174 thru 180 and a part of Lot 173 and a portion of right of way vacated at the northwest corner of Lot 180, Hasson Park, a subdivision in Kansas City, Jackson County, Missouri described as follows: Beginning 33.33 feet north of the southwest corner of said Lot 173; thence North 02 degrees 25 minutes 09 seconds East along the west line of plat of Hasson Park,

369.75 feet to the south right of way line of East 38th Street; thence South 87 degrees 39 minutes 13 seconds East along said line, 232.28 feet to a point of curvature; thence along a curve to the right with a radius of 25.00 feet and a distance of 39.30 feet to a point on the west right of way line of Montgall Avenue; thence South 02 degrees 24 minutes 43 seconds West along said line, 388.22 feet; thence North 87 degrees 37 minutes 00 seconds West, 128.68 feet; thence North 02 degrees 24 minutes 56 seconds East, 43.33 feet; thence North 87 degrees 37 minutes 00 seconds West, 128.68 feet to the point of beginning.

 

is hereby rezoned from Districts B3-2 (Community Business) and R-2.5 (Residential 2.5) to District UR (Urban Redevelopment), all as shown outlined on a map marked Section 88-20A-1271, which is attached hereto and made a part hereof, and which is hereby adopted as a part of an amendment to the zoning maps constituting a part of said chapter and in accordance with Section 88-20 thereof.

 

Section B. That a development plan for the area legally described above is hereby

approved, subject to the following conditions:

 

1.                     The developer shall secure approval of a street tree planting plan from the City Forester and plant according to said plan prior to  recording  the  final   plat.

 

2.                     The developer shall secure approval of a final UR plan from the Director of City Planning and Development prior to issuance of a building permit. This  plan  shall  demonstrate  compliance  with any  applicable  lot  and building standards of 88-100, use standards of 88-300, and development standards of 88-400 which are not expressly waived by approval of this preliminary development plan.

 

3.                     The   developer   shall  submit   an  affidavit,   completed   by  a   landscape architect licensed in the State of Missouri, verifying that street trees have been  installed  in  accordance  with the  approved  street  tree  planting plan and are healthy prior to certificate of occupancy.

 

4.                     The  developer  shall  secure  permits  to  extend  public  sanitary and  storm water   conveyance   systems   to  serve   all   proposed   lots    within   the development and determine adequacy of receiving systems as required by the Land  Development Division, prior to recording the plat or issuance of a building permit, whichever occurs   first.

 

5.                     The west half of Montgall Avenue shall be improved to City standards as required  by Chapter 88, to  current  standards,  including curbs,  gutters, sidewalks, streetlights, relocating any utilities as may be necessary and adjusting vertical grades for the road, and obtaining a required permit from the Land Development Division for said improvement prior to recording the plat or prior to issuance of a building permit, whichever occurs first.

 

6.                     The developer  shall  submit covenants,  conditions  and  restrictions  to  the Land Development Division for approval by the Law Department for the maintenance of private open space and enter into a covenant agreement for the maintenance of any stormwater detention area tracts, prior to recording the plat.

 

7.                     The developer shall dedicate additional right-of-way for Prospect Avenue as required by the adopted Major Street Plan so as to provide a minimum of 50 feet of right-of-way as measured from the centerline, along those areas   being  platted,   or  seek   approval   recommendations   from   the Transportation and Development Committee for any variances requested to the Major Street Plan prior to City Plan Commission approval.

 

8.                     The  developer  shall  cause  the  area  to  be  platted  and  processed  in accordance with Chapter 88, Code of Ordinances of the City of Kansas City, Missouri.

 

 

9.                     The developer shall pay impact fees as required by Chapter 39 of the City’s  Code  of  Ordinances,  as  required  by  the  Land   Development Division.

 

10.                     The developer shall submit plans for grading, siltation, and erosion control to the Land Development Division for review and acceptance, and secure a site disturbance permit for any proposed disturbance area equal to one acre or more prior to beginning any construction activities.

 

11.                     The developer shall submit verification of vertical and horizontal sight distance  for  the  drive  connection to  public  right-of-way to  the  Land Development   Division   and   make    improvements    to    ensure    local jurisdiction and/or minimum AASHTO adequate sight distance standards are met, prior to issuance of any certificate of occupancy.

 

12.                     The  developer  shall  obtain  the  executed  and  recorded  City approved grading, temporary construction, drainage/sewer, or any other necessary easements from the abutting property owner(s) that may be required prior to submitting any public improvements crossing properties not controlled by  the   developer  and   include   said   document(s)  within  the  public improvement applications submitted for permitting

 

13.                     The south half of East 38th Street shall be improved  to City standards as required  by  Chapter  88,  to  current  standards,  including  curbs,  gutters, sidewalks,  streetlights,  relocating any  utilities  as  may  be  necessary and adjusting vertical grades  for the road, and obtaining a required permit from the  Land  Development Division for  said  improvement prior to  recording the plat or prior to issuance of a building permit, whichever occurs first.

 

14.                     The developer shall grant a BMP and/or surface drainage easement to the City as required by the Land Development Division, prior to recording the plat or issuance of any building permits.

 

15.                     The developer shall submit a storm drainage analysis from a Missouri- licensed  civil  engineer  to  the  Land  Development  Division evaluating proposed  improvements and  impact  to  drainage conditions. Since  this project is within a "Combined Sewer Overflow" (CSO) district, the project shall be designed to retain rainfall of 1.5 inch depth over the entire site to simulate natural runoff conditions and reduce small storm discharge to the combined sewer system and manage the 10-year storm and 100-year storm per currently adopted APWA standards. The analysis shall be submitted, and  the  developer shall secure permits to  construct any improvements required by the Land Development Division prior to recording the plat.

 

16.                     The  developer shall ensure that  water and  fire  service  lines  should  meet current Water Services Department rules and regulations.

 

 

17.                     The   developer  shall  submit  an  analysis  by  a  registered   professional engineer  in  Missouri  to  verify  adequate  capacity  of the  existing  water mains  and   verify  fire   flow  capacity  prior  to  C ity  Plan  Commission. Depending on adequacy of the existing water mains systems, making other improvements as may be required.

 

18.                     The  developer  shall  provide  a  fire   hydrant  plan  for  a  hydrant  to  be installed on Montgall   Avenue.

 

19.                     The developer shall follow the Kansas City, Missouri rules and regulations for domestic water and fire service lines.

 

20.                     The developer shall pay money in lieu of dedication of parkland in the amount pursuant to the formula or dedicate acreage of private open space for parkland purpose as identified in 88-408. The money in lieu is to be paid prior to certificate of occupancy.

 

Calculation will be as follows: (# of townhome units) X (2.0) X (0.006 acres per person) = Parkland Acres X 2020 Rate ($48,801.37) = Parkland Fee.

 

21.                     The developer shall submit a streetscape plan with street tree planting plan per  88-425-03 for  approval and  permitting by the  Parks  and  Recreation Department’s  Forestry  Division  prior  to  beginning  work  in  the  public right-of-way.

 

22.                     Buildings shall comply with accessible route from public sidewalk to units per  1104.1  and  1107.6.2.2.2  of  International  Building  Code  2012 and

1004.1 of American National Standard ANSI A117.1-2003. Units also will be on a route from common areas per above sections. Note: The section requires every unit to be type B unit.

 

23.                     Stormwater  management  facilities,  including but not limited to detention basins   and   BMPs,   shall   be   privately   maintained   and   covered   by maintenance covenant(s) or easement(s) that include provisions for private  maintenance.

 

24.                     Fire hydrant(s) are required within 400 feet on a fire access road following an approved route established by the Authority Having Jurisdiction (AHJ) of any exterior portion of a building. The use of existing fire hydrant(s) may be used to satisfy this requirement otherwise a private fire hydrant(s) or hydrant system may be required. This distance may be increased to 600 feet for R-3 and U occupancy(s) or the building(s) is fully protected by an approved automatic fire sprinkler system(s). (IFC-2018: § 507.5.1)

 

25.                     The project will meet the  fire  flow requirements as set forth in   Appendix

B of the International Fire Code 2018. (IFC-2018 § 507.1)

 

26.                     All construction shall be  in  compliance  of the  applicable building codes which are  in  effect  at the  time  of construction and  shall  be  built  under valid  building  permits  issued  by  the  City  Planning  and  Development Department. (IFC-2018 §   102.4)

 

A copy of said development plan is on file in the office of the City Clerk with this ordinance and is made a part hereof.

 

Section C. That the Council finds and declares that before taking any action on the proposed amendment hereinabove, all public notices and hearings required by the Zoning and Development Code have been given and had.

 

end

______________________________________________________

 

 

I hereby certify that as required by Chapter 88, Code of Ordinances, the foregoing ordinance was duly advertised and public hearings were held.

 

 

 

                                                                                                                           _______________________________

                                                                                                           Secretary, City Plan Commission

 

 

 

Approved as to form and legality:

 

 

______________________________

Sarah Baxter

Assistant City Attorney