Title: Sponsor: Director of City Planning and Development Department Approving a development plan on about 5.1 acres to allow for a major amendment to an approved development plan for the construction of two hotels in District B3-3 generally located at N. Newark Circle and N. Ambassador Drive. (CD-CPC-2023-00152)
Sponsors: Director of City Planning & Development, City Plan Commission
Attachments: 1. Docket Memo 230993, 2. 11-7-2023 CPC PPT, 3. CPC Approved Plan (11-07-2023), 4. CPC Disposition Letter (11-07-2023), 5. 09_CD-CPC-2023-00152_CourtyardMarriott_11723, 6. 12-6 NPD 230991.230992.230993, 7. Authenticated Ordinances 230993

ORDINANCE NO. 230993

 

title

Sponsor:  Director of City Planning and Development Department

 

Approving a development plan on about 5.1 acres to allow for a major amendment to an approved development plan for the construction of two hotels in District B3-3 generally located at N. Newark Circle and N. Ambassador Drive. (CD-CPC-2023-00152)

 

body

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

 

                     Section A.  That a development plan in District B3-3 generally located at N. Newark Circle and N. Ambassador Drive, and more specifically described as follows:

 

Lot F, Plaza International, Third Plat, a subdivision in Kansas City, Platte County, Missouri.

 

is hereby approved, subject to the following conditions:

 

1.                     The developer shall submit an affidavit, completed by a landscape architect licensed in the State of Missouri, verifying that street trees have been installed in accordance with the approved street tree planting plan and are healthy prior to a certificate of occupancy.

 

2.                     The developer shall submit an affidavit, completed by a landscape architect licensed in the State of Missouri, verifying that all landscaping required of the approved plan has been installed in accordance with the plan and is healthy prior to a certificate of occupancy.

 

3.                     The developer shall screen all roof and/or ground mounted mechanical and utility equipment in compliance with 88-425-08.

 

4.                     The developer shall submit an affidavit, prepared by an engineer licensed in the State of Missouri, verifying that all outdoor lighting has been installed in accordance with approved plans and that lighting levels do not exceed that shown on the approved lighting plan at the property lines prior to a certificate of occupancy.

 

5.                     All signage shall conform to 88-445 and shall require a sign permit prior to installation.

 

6.                     The developer shall secure approval of a project plan from the City Plan Commission for the proposed hotel on the southern lot prior to a building permit

 

7.                     The developer shall submit an analysis to verify adequate capacity of the existing sewer system as required by the Land Development Division prior to issuance of a building permit to connect the private system to the public sewer main and depending on adequacy of the receiving system, make other improvements as may be required.

 

8.                     The developer shall pay impact fees as required by Chapter 39 of the City’s Code of Ordinances, as required by the Land Development Division.

 

9.                     The developer shall submit a macro storm drainage study with the first plat or phase, from a Missouri-licensed civil engineer to the Land Development Division showing compliance with current adopted standards in effect at the time of submission, including water quality BMP’s, to the Land Development Division for review and acceptance for the entire development area, and submit a micro storm drainage study with each subsequent plat or phase showing compliance with the approved macro and adopted standards.  The developer shall secure permits to construct any improvements as necessary to mitigate impacts from rate, volume, and quality of runoff from each proposed phase, prior to recording the plat or prior to issuance of a building permit, whichever occurs first, as required by the Land Development Division.

 

10.                     The developer shall submit a streetscape plan for approval and permitting by the Land Development Division prior to beginning construction of the streetscape improvements in the public right-of-way, and construct ADA compliant ramps at all required locations where new private drives are being added, or where existing sidewalks are modified or repaired.

 

11.                     The developer shall submit verification of vertical and horizontal sight distance for the drive connection to public right-of-way to the Land Development Division and make improvements to ensure local jurisdiction and/or minimum AASHTO adequate sight distance standards are met, prior to issuance of any certificate of occupancy.

 

12.                     The developer shall submit a letter to the Land Development Division from a licensed civil engineer, licensed architect, or licensed landscape architect, who is registered in the State of Missouri, that identifies sidewalks, curbs, and gutters in disrepair as defined by Public Works Department’s "OUT OF REPAIR CRITERIA FOR SIDEWALK, DRIVEWAY AND CURB revised 11/5/2013" and based on compliance with Chapters 56 and 64, Code of Ordinances, for the sidewalks, curbs, and gutters where said letter shall identify the quantity and location of sidewalks, curbs, and gutters that need to be constructed, repaired, or reconstructed to remedy deficiencies and/or to remove existing approaches no longer needed by this project.  The developer shall secure permits to repair or reconstruct the identified sidewalks, curbs, and gutters as necessary along all development street frontages as required by the Land Development Division and prior to issuance of any certificate of occupancy permits including temporary certificate of occupancy permits.

 

13.                     The developer shall submit plans for grading, siltation, and erosion control to the Land Development Division for review and acceptance, and secure a site disturbance permit for any proposed disturbance area equal to one acre or more prior to beginning any construction activities.

 

14.                     The developer shall cause the area to be platted and processed in accordance with Chapter 88, Code of Ordinances of the City of Kansas City, Missouri.

 

15.                     The developer shall grant a BMP and/or surface drainage easement to the City as required by the Land Development Division and the Kansas City Water Services Department, prior to recording the plat or issuance of any building permits.

 

16.                     The project shall meet the fire flow requirements as set forth in Appendix B of the project International Fire Code 2018. (IFC-2018§ 507.1)

 

17.                     Buildings equipped with a fire standpipe system shall have an operable fire hydrant within 100 feet of the Fire Department Connection (FDC). (IFC2018 § 507.5.1.1)

 

18.                     A required Fire Department access road shall be an all-weather surface. (IFC-2012: § 503.2.3) Fire Department access roads shall be provided prior to construction/demolition projects begin. (IFC-2018 § 501.4 and 3310.1; NFPA 241-2013 § 7.5.5)  Required Fire Department access roads shall be designed to support a fire apparatus with a gross axle weight of 85,000 pounds.  (IFC-2018: § 503.2.3)

 

19.                     Aerial fire apparatus access roads shall be provided for any building that is 30 feet in height or greater.  Aerial fire apparatus Roads are a minimum 26 feet wide, at least 15 feet away from the building but not more than 30 feet from the structure.  (IFC-2018 § D105).

 

20.                     New buildings shall have approved radio coverage for emergency responders within the building based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. This section shall not require improvement of the existing public safety communication systems. (IFC 2018 510.1) and (NFPA1221)

 

21.                     No water service line will be less than 1-1/2” in diameter where three or more units or commercial building will be served by one domestic service line and meter.

 

22.                     The developer shall have a water flow test done to ensure there is adequate water pressure to serve the development.

 

23.                     The developer shall ensure that water and fire service lines should meet current Water Services Department rules and regulations prior to a certificate of occupancy.

 

24.                     The developer shall secure permits to extend public sanitary and storm water conveyance systems to serve all proposed lots within the development and determine adequacy of receiving systems as required by the Land Development Division, prior to recording the plat or issuance of a building permit, whichever occurs first.

 

25.                     The developer shall provide adequate easements for the public sanitary sewer located on private property.

 

A copy of said development plan is on file in the office of the City Clerk with this ordinance and is made a part hereof.

 

                     Section B.  That the Council finds and declares that before taking any action on the proposed amendment and development plan hereinabove, all public notices and hearings required by the Zoning and Development Code have been given and had.

 

end

______________________________________________________

 

I hereby certify that as required by Chapter 88, Code of Ordinances, the foregoing ordinance was duly advertised and public hearings were held.

 

 

______________________________

Joseph Rexwinkle, AICP

Secretary, City Plan Commission

 

Approved as to form:

 

 

______________________________

Sarah Baxter

Senior Associate City Attorney