File #: 230997    Version: 1 Name:
Type: Ordinance Status: Passed
File created: 11/22/2023 In control: Council
On agenda: 12/7/2023 Final action: 12/7/2023
Title: Sponsor: Director of Water Services Department Authorizing a $787,800.00 construction contract with Infrastructure Solutions, LLC, for the Dry Weather Sewer Line: Outfall 055 project; authorizing a maximum expenditure of $866,000.00; authorizing a $240,000.00 design professional Amendment No. 3 to Contract No. 1582 with DuBois Consultants, Inc., for the Dry Weather Sewer Line: Outfall 055 project for a total contract amount of $687,305.60, and recognizing this ordinance as having an accelerated effective date.
Sponsors: Director of Water Services
Attachments: 1. Docket Memo Outfall 055_SGS, 2. CN1583 Construction Goals Approval, 3. CN1583-Infrastructure CUP Document Submittal, 4. CN1583-Bid Tab-Signed, 5. 1582 DPS SLBE-WSDEPS Approval, 6. 1582 Executed DPS Contract + Amendments 1-3, 7. 1583 Construction Contract, 8. 230997 TIO Presentation 12-06-2023, 9. Ordinance 230997-CUP Summary-- 1583.pdf, 10. Authenticated Ordinances 230997
ORDINANCE NO. 230997

title
Sponsor: Director of Water Services Department

Authorizing a $787,800.00 construction contract with Infrastructure Solutions, LLC, for the Dry Weather Sewer Line: Outfall 055 project; authorizing a maximum expenditure of $866,000.00; authorizing a $240,000.00 design professional Amendment No. 3 to Contract No. 1582 with DuBois Consultants, Inc., for the Dry Weather Sewer Line: Outfall 055 project for a total contract amount of $687,305.60, and recognizing this ordinance as having an accelerated effective date.

body
WHEREAS, City Council passed Ordinance No. 200267 on April 30, 2020, authorizing a $242,000.00 design professional services Contract No. 1582 with DuBois Consultants, Inc., for conceptual and preliminary design and authorizing a maximum expenditure of $450,000.00 for final design of the Dry Weather Sewer Line: Outfall 055 project; and

WHEREAS, the City executed a $205,305.60 Amendment No. 1 on February 15, 2022, with DuBois Consultants, Inc., which authorized funds for final design services; and

WHEREAS, the City executed a no-cost Amendment No. 2 on June 28, 2022, with DuBois Consultants, Inc., which authorized an update to the design professional's billing rates; and

WHEREAS, this proposed ordinance is for authorization of a construction project and design professional services Amendment No. 3 for the Dry Weather Sewer Line: Outfall 055 project; NOW, THEREFORE,

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Section 1. That the Director of the Water Services Department is authorized to execute Contract No. 1583 in the amount of $787,800.00 with Infrastructure Solutions, LLC, for the Dry Weather Sewer Line: Outfall 055 project, Project No. 81000919. A copy of the contract is on file in the office of Water Services.

Section 2. That the Director of Water Services Department is authorized a maximum expenditure of $866,000.00 from Account No. AL-81...