Title: Sponsor: Director of the Water Services Department Authorizing a $25,245,892.00 construction contract with Kissick Construction Company, Inc., for the Inflow and Infiltration (I/I) Reduction: North of the River Phase 1, Buckeye Creek Area and Water Main Replacement in the Area of N. Briarcliff Road to N. Kensington Avenue, N.E. 36th Street to N.E. 49th Terrace project; authorizing a maximum expenditure of $27,771,000.00; and authorizing a $1,890,000.00 Design Professional Services Amendment No. 1 to Contract No. 1508 with Lamp Rynearson, Inc., for a total contract amount of $2,840,000.00.
Sponsors: Director of Water Services
Attachments: 1. 1508 Executed DPS Contract and Proposed Amendment 1, 2. 1527 Construction Contract, 3. 1508 Approved Goals, 4. 1508 Docket Memo (RFM approval), 5. 1527 CREO KC Approved Goals, 6. 1527 Docket Memo, 7. 230141 Docket Memo, 8. 230141 KCW TIO Cmte Presentation 3-1-23, 9. Authenticated Ordinance 230141
ORDINANCE NO. 230141

title
Sponsor: Director of the Water Services Department

Authorizing a $25,245,892.00 construction contract with Kissick Construction Company, Inc., for the Inflow and Infiltration (I/I) Reduction: North of the River Phase 1, Buckeye Creek Area and Water Main Replacement in the Area of N. Briarcliff Road to N. Kensington Avenue, N.E. 36th Street to N.E. 49th Terrace project; authorizing a maximum expenditure of $27,771,000.00; and authorizing a $1,890,000.00 Design Professional Services Amendment No. 1 to Contract No. 1508 with Lamp Rynearson, Inc., for a total contract amount of $2,840,000.00.

body
WHEREAS, the City Council by Ordinance No. 190909 on November 7, 2019, approved a $950,000.00 design professional services contract with Lamp Rynearson, Inc. for the North of the River Phase I - Buckeye Creek project; NOW, THEREFORE,

BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:

Section 1. That the Director of the Water Services Department is authorized to execute Contract No. 1527 in the amount of $25,245,892.00 with Kissick Construction Company, Inc., for the Inflow and Infiltration (I/I) Reduction: North of the River Phase 1, Buckeye Creek Area and Water Main Replacement in the Area of N. Briarcliff Road to N. Kensington Avenue, N.E. 36th Street to N.E. 49th Terrace project, Project Nos. 81000833, 80002219, and 80002276. A copy of the contract is on file in the office of Water Services.

Section 2. That the Director of the Water Services Department is authorized a maximum expenditure of $15,468,907.00, from Account No. AL-8193-807769-611060-81000833, Overflow Control Program, to satisfy the cost of this contract.

Section 3. That the Director of the Water Services Department is authorized a maximum expenditure of $12,302,093.00, from Account No. AL-8079-807705-611060-80002219, Water Main Replacement Program, to satisfy the cost of this contract.

Section 4. That the Director of the Water Services Departmen...