ORDINANCE NO. 230996
title
Sponsor: Director of Water Services Department
Authorizing a $20,058,500.00 construction contract with Infrastructure Solutions, LLC, for the Sewer Separation: 40th and Monroe project; authorizing a maximum expenditure of $22,065,000.00; authorizing a $2,200,000.00 design professional services Amendment No. 4 to Contract No. 1507 with HDR Engineering, Inc., for the Sewer Separation: 40th and Monroe project for a total contract amount of $4,325,271.00; and recognizing this ordinance as having an accelerated effective date.
body
WHEREAS, City Council passed Ordinance No. 190036 on January 24, 2019, authorized a $1,056,000.00 design professional services Contract No. 1507 with HDR Engineering, Inc., for conceptual and preliminary and authorizing a maximum expenditure of $2,500,000.00 for final design of the Sewer Separation: 40th and Monroe project; and
WHEREAS, the City executed a $921,000.00 Amendment No. 1 on September 20, 2020, with HDR Engineering, Inc., which authorized moving the project from the preliminary design phase to final design phase; and
WHEREAS, the City executed a no-cost Amendment No. 2 on October 31, 2022, with HDR Engineering Inc., which authorized additional work on the project related to easement acquisition work in coordination with Water Services; and
WHEREAS, the City executed a $148,271.00 Amendment No. 3 on October 5, 2023, with HDR Engineering, Inc., which authorized additional design services for water main replacements, sewer separation re-design, and green infrastructure re-design as well as extending the term an additional 12 months due to easement negotiations; and
WHEREAS, this proposed ordinance is for authorization of a construction project and design professional services Amendment No. 4 for the Sewer Separation: 40th and Monroe project; NOW, THEREFORE,
BE IT ORDAINED BY THE COUNCIL OF KANSAS CITY:
Section 1. That the Di...